Heavy

PK 200002 L SH High Performance

Loader Crane

PK 200002 L SH High Performance

The long boom design is mainly intended for operations with high outreach

  • High mobility due to the mounting on standard truck chassis
  • Very stiff and light boom system thanks to new P-Profile
  • Hydraulic lifting height of roughly 49 meter thanks to long boom design
  • Additional applications with Power Link Plus
  • High working speed thanks to double circuit control
  • Special stabiliser concept with extendable rear stabiliser ram
  • Maximum precision and safety due to AOS
  • Maximum utilisation of the working range thanks to extended HPSC
  • More efficiency with fly-jib due to DPS Plus

PALFINGER CONNECTED

Efficiency for fleet, truck and crane - we support you in modern fleet management with two efficient digital platforms, optimzied for fleet managers and crane operators. 

Details

Continuous Slewing System

The PALFINGER Continuous Slewing Mechanism permits an unrestricted radius of action. The crane is rotated or 'slewed' using a gear box and hydraulic motor instead of a rack and pinion system. All endless slewing mechanisms come as standard with a high quality roller ball bearing.

Details

Low-maintenance extension system

With sliding elements made of synthetic material and the high-quality KTL coating, this boom system significantly simplifies service performed by the operator. This saves time and money – and protects the environment.

Power Link Plus

With the 15 degree reverse linkage system on the knuckle boom and the 25 degree reverse linkage system fly-jib, you can reach through low door openings and also work inside buildings. Heavy crane work – even in difficult conditions.

S-HPLS

S-HPLS is one of the most important functions of the PALTRONIC 150. It is a fully automatic system for increasing the lifting power. Depending on the need, there is continuous adaptation of the lifting power and speed of the crane.

Soft Stop

The Soft Stop function is an electronic limit position damper. It causes gentle braking of all crane movements before the limit position is reached. Hence, jerky movements and load impacts can be avoided. The crane can be operated more gently and precisely.

Downloads

Brochures

PK 200002 L SH

11,4 MB Download

Interactive PDF PK 200002L SH

3,98 MB Download