Bridge Inspection Units

railway_pb4_action

PALFINGER BRIDGE INSPECTION UNITS 

PALFINGER bridge inspection units have been successfully used on a large number of railway ve-hicles, 2-way vehicles and road vehicles for many years. They stand out by virtue of a particularly large operating range both above and below track level. Equipped with electrical, hydraulic and pneu-matic energy in the workman baskets, these units can also be used for taking material samples and for carrying out light repair work.

PALFINGER bridge inspection units offer:
  • A large operating range 
  • A high level of working comfort 
  • Maximum operational safety 
  • The shortest possible setting up and dismantling times 
  • Full mobility in inspection operation without stabilizer supports 
  • An optimum weight/performance ratio