Home Sitemap      Language      Jobs     Extranet  Palfinger Websites
History:   Assembling Search:  

*** - Werte 15 Minuten verzoegert -                                                                                                       *** VIE: 20.11.2008 17:33 PALFINGER AG 10.05 (10.47)                                                                                                       *** VIE: 20.11.2008 17:36 ATX 1562.47 (1646.62)                                                                                                       *** powered by APA ~  


  PALFINGER AG
F.-W.-Scherer-Straße 24
A-5101 Bergheim/Salzburg
Austria

Tel : +43(0)662/4684-0
Fax : + 43 (0)662/ 45 01 00

info@palfinger.com
ASSEMBLING
Save and precise handling of components during the assembling process is a great challenge for facilities and personnel. Due to a wide product range several specially designed assembling fixtures, tools and techniques come to use. Hence not only economic demands can be met but also ergonomic standards set.
 
zoom Zoom
Handling facilities and assembling fixtures
The picture to the left shows a handling facility which is being used to move and position the boom-system to the base frame of a crane. Again great flexibility is sometimes the most important design character of such handling tools.
 
zoom Zoom
Pre-assembling
Certain sub-assemblies, with special functions, are being pre-assembled and later on locked in the main assembling process. In doing so the sub-assemblies are already being tested according the specification of the final product. Thus the sub-assemblies can be integrated without any time loss.
 
zoom Zoom
Ergonomic working placesIn order to provide appropriate and efficient working conditions, various working places are equipped with specially designed equipment.