Home Sitemap      Language      Jobs     Extranet  Palfinger Websites
History:   System solutions Search:  

*** - Werte 15 Minuten verzoegert -                                                                                                       *** VIE: 09.05.2008 17:33 PALFINGER AG 25.94 (25.77)                                                                                                       *** VIE: 09.05.2008 17:33 ATX 4262.17 (4294.89)                                                                                                       *** powered by APA ~  
System solutions
Increasing traffic densities result in ever-increasing maintenance effort. However, there is less and less time available for carrying out such maintenance and inspection work. Efficient construction, maintenance and service vehicles and the best-possible mechanisation of numerous working operations are therefore an essential requirement for avoiding disruptions to regular traffic.

PALFINGER meets these requirements with its extensive system solutions. For this purpose, lifting platforms, positioners and cranes are deployed individually or - depending on the work to be carried out - combined with each other. 
PALFINGER RAILWAY
Construction/Maintenance of overhead contact systems
The speedy, precise and cost-efficient construction of new overhead contact systems calls for simultaneous access to the contact wire and suspension cable along with uncompromising safety ...
Track construction/maintenance
Short blocking times put constant pressure on the railway staff responsible for track maintenance. Minimal setup times are therefore a key criterion for track motor vehicles ....
Work in tunnels and underground systems
PK 700 T - The innovative railway crane wagon ideally fulfils the often seemingly irreconcilable requirements which are demanded by track work in tunnels under extremely restricted space conditions ...